Our company produce vertical turbine pump,vertical long axis pump, vertical type condensate pump ,vertical wet pit pump,right Angle gear box
Manufacturer of vertical turbine pumpFocus on vertical wet pit pump, right Angle gear box
HOTLINE:+8618507312158+8613974960765
Contact us
Vertical turbine pump manufacturers
HOTLINE::+8613974960765
Mobile:+8618507312158
Email:sale@ljpump.net
Address :China's hunan province changsha furong road long xiang industrial park
Your position: HOME >> Knowledge >> vertical turbine pump
vertical turbine pump

Maintenance of LC Vertical Long Shaft Pump

时间:2022/7/16 21:49:55 来源: 点击:

Maintenance of LC Vertical Long Shaft Pump


LC type vertical long shaft pump should be disassembled and repaired when necessary (vibration, noise, bearing temperature exceeding allowable value, flow rate, head significantly decreased, etc.). For continuous operation of vertical long-axis pumps, regular inspection should be carried out every year.

(1) Prepare spare parts in advance for the maintenance of vertical long-axis pumps.

(2) Disassemble the vertical long-axis pump according to the reverse assembly sequence. After disassembly, the rust spots on the parts should be removed and then re-painted.

(3)Check the clearance between the impeller and seal ring. Please refere to below chart.

Norminal diameter

125

160

200

250

315

400

500

630

The maximum clearance allowed

 

1.1~1.8

 

1.2~2.0

 

1.3~

2.2

 

1.5~

2.5

 

1.7~

2.8

 

1.9~

3.1

 

2.1~

3.5

 

2.4~

4.0

Check the abrasion of guide bearing. Please see below table for reference.

Nominal diameter

60

80

100

120

140

160

180

The maximum clearance allowed

 

0.4~0.8

 

0.5~0.9

 

0.6~1.0

 

0.7~1.2

 

0.8~1.3

 

0.9~1.4

 

1.0~1.5

4) Check the abrasion of the shaft sleeve and the packing sleeve. If the abrased slots diameter reaches 1~2mm, please replace it.

5) Check the abrasion of the impeller and impeller body.

6) Replace the sealing parts , like packing seal, O-ring seal and paper washer.

7) Assemble the pump in order and rotate the pump rotors which should run smoothly.

Attention:

The safety procedure and regulations should be followed throughout the inspection. Before any inspection, please do as below:

1.Cut the motor power off and all the instruments.

2.Shut the outlet and inlet valve.

3. Cut off cooling water.


Online Service
Contact

TEL

+8618507312158

+8613974960765

WeChat
Online
Service